Latest Brochures

  • Brochure

    Asbestos Roof Encapsulation

    Extend your industrial roof’s life without costly replacement. GLS’s spray-applied system seals asbestos sheets fast and is touch-dry in 10 seconds. VOC-free and fully waterproof.

  • Brochure

    GLS100R® Rail Infrastructure Coating

    GLS100R® is a Network Rail-approved coating designed for use across OLE bridges, platforms, line markings, and more. Touch-dry in under 10 seconds, electrically insulates up to 193,000 V.

  • Brochure

    Floor Coating

    Resin-based systems designed for fast-track installation, heavy use, and lasting durability. Withstand forklift wear, chemical spills, and abrasion. Touch dry in under 10 seconds and fully traffic ready in hours. Ideal for industrial and commercial environments.

Latest Case Studies

  • Case Study

    Asbestos Roof Encapsulation

    NHS Hospital Site

    GLS sealed a leaking asbestos roof at Denmark Hill Hospital without disrupting operations. Using a two-stage encapsulation system, the team stabilised the roof, sealed cracks, and ensured full compliance with asbestos regulations.

  • storage kind asbestos roof coating afterwards
    Case Study

    Asbestos Roof Encapsulation

    Commercial Storage Facility

    Over 7,500 m² of asbestos roofing was encapsulated in Liverpool with zero site disruption. GLS’s seamless coating system delivered a rapid and durable fix, touch dry in under 10 seconds, extending roof life without a full re-roof.

  • Case Study

    Asbestos Roof Encapsulation

    Manufacturing Facility

    GLS encapsulated over 6,000 m² of aging fibre cement roofing at TRB’s manufacturing facility. The project delivered a watertight, long-term solution without disturbing the original asbestos-containing materials.

  • manchester victoria railway station where GLS insulated electrical components
    Case Study

    Rail Coating

    Bridge and Trackside Coating

    GLS applied GLS 100R® across bridges, parapets, and trackside assets to eliminate touch potential risks ahead of rail electrification. Despite complex access, works were completed on time using track-mounted rigs and street-level spray systems.

  • cardiff intersection bridge where GLS applied rail coating
    Case Study

    Rail Coating

    Rail Bridge Underside Coating

    GLS coated the underside of a railway bridge using GLS 100R® to resolve electrification clearance issues. This avoided a £40–50M bridge rebuild, cutting cost and disruption dramatically.

  • ineos runcorn site where we coated a bund tank
    Case Study

    Bund Coating

    Chemical Bund Joint Sealing

    GLS Coatings sealed leaking expansion joints in caustic chemical bunds at the INEOS site using our ultra-fast curing protective coating. Compliant with UK Oil Storage Regulations. Returned to service the same day.

  • case study for leeds bradford airport
    Case Study

    Bund Coating

    Aviation Fuel Bund Repair

    After a failed fibreglass coating compromised a bund at an aviation fuel point, GLS applied GLS 100R spray coating for chemical resistance and seamless sealing. Full function restored within 24 hours.

  • machenster university wave tank coating example
    Case Study

    Wave Tank Bund Coating

    Research Wave Tank and Bund Lining

    GLS lined a research wave tank and bund using Impermax QC polyurethane membrane. The solution provided long-term waterproofing with fiberglass mat reinforcement and seamless durability for academic use.

  • corrosion protected coating applied to a manhole for yorkshire water by GLS
    Case Study

    Manhole Coating

    Corroded Manhole Restoration

    GLS restored two severely corroded manholes using our M-Coating system with H₂S-resistant mortar. The project avoided full excavation, reduced disruption to woodland surroundings, and was completed in just two days.

Can't find the right information for you?

Request a Case Study

Fill in your details and we’ll send it to your inbox.

Request a Brochure

Fill in your details and we’ll send it to your inbox.