Ground Consolidation & Foundation Stabilisation

Strengthen weak ground and stabilise sinking structures with precision resin injection. Fast, clean and non-disruptive.

Book a free consolidation site survey today

Network Rail logoThames Water logoUniveristy of Cambridge logoScotRail Scotlands Railway logoKier logoMitie logoBalfour Beatty logo
Network Rail logoThames Water logoUniveristy of Cambridge logoScotRail Scotlands Railway logoKier logoMitie logoBalfour Beatty logo

Why Use Resin Injection for Ground Consolidation?

Ground consolidation with resin injection strengthens weak or unstable soils by compacting and binding the substrate. It prevents problems like erosion, poor compaction, foundation settlement, and subsidence without the need for excavation or piling. The expanding resin fills voids, increases load-bearing strength, and provides a fast, clean, and non-intrusive alternative to traditional underpinning methods.

Applications Of
Ground Consolidation

  • Soil Stabilisation

    Reinforce unstable or eroded ground beneath industrial sites, roads, or warehouses. Resin injection strengthens soil layers to prevent future settlement or collapse.

  • railway station walkway made out of concrete that could crack over time

    Rail Embankments and Track Beds

    Stabilises soils under rail embankments and track beds, preventing movement and erosion while keeping operations safe with minimal disruption.

  • Foundation Re-Support & Crack Closure

    Inject resin under shifted foundations to compact soil, relevel the base, and potentially close visible structural cracks in walls or slabs, helping minimise downtime.

  • Road & Runway Strengthening

    Address erosion-created voids around buried utilities, culverts, or structures. Prevents progressive failure and maintains safety.

  • Bridge Support & Stabilisation

    Stabilises the ground beneath bridges to prevent settlement and erosion, improving long-term safety and load capacity without excavation.

  • Pre-Construction Soil Conditioning

    Strengthen fill material or loose ground prior to new construction, especially in brownfield or reclaimed sites. Ensures safe, long-term load support.

The GLS Ground Consolidation Benefits

Health & Safety Commitment

We are committed to delivering ground consolidation services to the highest safety standards. Our work follows strict UK regulatory guidelines, with every project carried out by trained technicians. The entire process is documented and quality-assured using our digital tracking system, giving clients complete transparency and peace of mind on site.

Utility Location Checks for Ground Stabilisation

Ground stabilisation projects often involve deep resin injection near buried services. GLS Coatings’ trained technicians use CAT & Genny detection tools to trace gas, water, and electric lines before any works commence, protecting both the site and surrounding infrastructure.
gls technician performing a CAT scan to check for underground utilities

Ensure Your Drainage Is Ready
for Ground Consolidation

Strong, stable ground starts with reliable drainage. Before resin injection begins, we carry out essential inspections and protection to make sure leaking or damaged pipes won’t compromise consolidation or long-term stability.

CCTV Drainage Survey

Before carrying out ground consolidation, a full CCTV drainage survey checks the condition of nearby pipes and drainage runs. High-resolution cameras allow us to identify:

  • Cracks or fractures causing soil washout

  • Root ingress or blockages weakening ground conditions

  • Collapsed sections or leaks undermining stability

  • Risks of water flow contributing to erosion or subsidence

By detecting and addressing hidden issues early, we ensure the consolidation process strengthens the ground effectively and delivers long-term stability.

Drainage Protection & Pipe Sealing

If defects are found, we seal or coat drainage sections before resin injection begins. Securing the drainage system at this stage prevents future erosion or ground movement.

We use specialist materials to:

  • Seal leaks that allow soil or water to escape

  • Reinforce weakened pipes near foundations, yards, or roadways

  • Prevent resin or water from entering the drainage system

  • Maintain ground stability during and after injection

This step is especially important for industrial sites, roads, and high-traffic areas where drainage integrity plays a critical role in long-term soil stabilisation.

Ground Testing and Soil Assessment Before Resin Injection

Before any resin injection or ground stabilisation work begins, it’s vital to understand the exact condition of the ground beneath the surface. Our Pagarni Ground Testing service provides a detailed assessment of subsurface conditions, helping us identify the strength, composition, and stability of the soil.

Using advanced ground testing equipment, our engineers measure soil resistance, load capacity, and density to pinpoint any weaknesses or voids that could affect structural integrity.

This essential step ensures we apply the correct resin type, injection method, and pressure levels to achieve lasting stability and prevent future movement.
PAGANI DPM 30 ground testing before starting resin injection
Whether it’s for industrial sites, commercial foundations, or infrastructure repairs, the Pagarni Ground Test gives you accurate data to make informed decisions before work begins.

By combining scientific testing with practical experience, we deliver reliable results, reduce project risk, and ensure the long-term success of every resin injection or ground stabilisation project.

Need advice regarding your unstable ground?

The Consolidation Process

Our ground consolidation process begins with a survey to assess unstable soil or settlement issues. Once reviewed, we provide a tailored quote for polyurethane resin injection.

Book Site Survey

Our team will assess ground beneath your structure and recommend the best resin-based stabilisation method.

Get A Free Quote

We’ll provide a fixed quote with timescale, warranty details, and the resin injection system we’ll use.

Concrete Lifted

We inject resin into the ground to compact soil and re-support structures, with minimal downtime.

AMCO Giffen

GLS Coatings' professionalism and performance to the tasks in hand was exceptional. From the initial meeting and planning the work to the operatives onsite and the QA procedures undertaken during and after. I cannot fault GLS and would happily employ them again.

Gareth Griffiths, Project Manager 


Large UK Car Manufacturer

We were incredibly impressed with GLS and the expertise of Marc Grimes. While other companies couldn’t give us a straight answer or a fixed price, GLS laid everything out clearly and delivered exactly what they promised. The job was done in a day, and we didn’t have to stop production – it was a huge relief.

Confidential

Wigan Council

GLS provided a complete and professional service, managing everything from start to finish. Their resin injection solution avoided the need to relocate the tenant and resolved the issue in a single day – saving time, money, and stress for everyone involved.

Wigan Council

Barhale

GLS delivered a full rehabilitation solution efficiently and professionally. Their knowledge of lining systems and ability to work safely in a confined space environment ensured a smooth, on-schedule delivery with a high-quality finish.

Project Manager

F.G.Whitley and Sons Co.

I have been extremely impressed by the standard of workmanship of GLS staff and will definately be using your team again.

Paul Whitley, Director

Water Utility Contractor

GLS offered a solution that addressed not only the immediate ground issues but also ensured the success of the long-term lining system. Their ability to diagnose, stabilise, and protect in a single coordinated effort made them the ideal delivery partner for this project.

Confidential

GLS Case Studies

  • Factory Floor Lifting

    Large UK Car Manufacturer

    GLS lifted a subsiding factory floor using resin injection, completed in one day with no production disruption. Our fixed-cost solution avoided demolition and delivered fast, transparent results.

  • Shaft Lining

    London Sewer Shaft

    GLS sealed and relined a rising sewer shaft in London affected by H₂S corrosion and water ingress. Resin injection stopped active leaks before applying a chemical-resistant epoxy lining, completed in 3 days with no disruption.

  • Ground Stabilisation

    Subsiding Residential Property

    GLS stabilised a subsiding council property with resin injection and drainage repairs. The internal floor was relevelled, external wall movement halted, and the job completed in 1 day with minimal tenant disruption.

  • Concrete Lifting

    Water Treatment Site

    GLS relevelled a 400m² sludge tank base using resin injection before applying a protective cementitious coating. The stabilised base enabled long-term protection from H₂S corrosion and water ingress, with zero disruption to site operations.

Ground Consolidation Across the UK

Frequently Asked Questions

  • What is ground consolidation and when is it needed?

    Ground consolidation strengthens weak or eroded soil beneath buildings or structures. It’s typically used when you notice cracking, subsidence, or visible signs of settlement, especially around foundations, driveways, or retaining walls.

  • How is resin injection different from traditional foundation repair?

    Unlike traditional methods that often involve heavy excavation or underpinning, resin injection is fast, clean, and non-invasive. It stabilises the ground from within by compacting soil and filling voids using expanding resin, minimising disruption.

  • Will resin injection help close cracks in walls or slabs?

    Yes, in many cases. As the resin expands and compacts the soil, it can lift settled structures slightly, which helps close or reduce visible cracks. However, results depend on site conditions and will be assessed during the survey.

  • How accurate is the injection process?

    The process is monitored in real-time using laser levels and sensors. Our trained technicians inject resin at controlled depths and pressures to ensure precise stabilisation, tailored to each project’s specific soil conditions.

  • How long does the consolidation process take?

    Most projects are completed in one to two days, depending on size and severity. The resin cures quickly, often within minutes, meaning surfaces are usable shortly after injection is complete.

  • Is the process safe and certified?

    Yes. Our team follows UK safety standards and procedures. All technicians are trained in confined-space working, and we use a digitally recorded QA system to ensure full transparency and traceability of the work carried out.

Reach out about a consolidation survey

GLS Coatings Ltd

Request a Case Study

Fill in your details and we’ll send it to your inbox.

Request a Brochure

Fill in your details and we’ll send it to your inbox.