Why Choose GLS100R® for Rail Coating?

GLS100R® is our patented, trademarked electrical insulation coating, purpose-built for the UK rail industry. Engineered in-house and independently tested, it protects infrastructure from electrical risks, corrosion, water ingress, and surface wear. With instant curing, no disruption to operations, and insulation proven up to 193,000 volts, GLS100R® is the fast, safe, and certified choice for coating bridges, OLE steelwork, platforms, and depots.
rail coating application out of a van OLE bridge

Types Of Rail
Coating Applications

  • OLE Bridges & Steelwork

    Coat steel structures near Overhead Line Equipment (OLE), especially where clearance is limited and flash-over risk is high. It eliminates the need to raise bridges or lower tracks by electrically insulating steelwork up to 193,000 volts.

  • Touch Potential Protection at Stations

    Applies to new station builds or upgrades where steel elements pose shock risks. Approved to insulate up to 193,000 volts.

  • Anti-Slip Platform Coatings

    Ideal for footbridges, stairs, and platform edges, GLS100R® provides a tough, fast-drying anti-slip surface that improves passenger safety.

  • Location Case Coating

    Coat signalling location cases, even while live, removing the need to power down or interrupt services. It protects critical equipment from electrical faults, moisture ingress, and corrosion.

The GLS100R® Rail Infrastructure Benefits

GLS100R® Coating Demonstration

Watch GLS100R® applied in a live rail setting. Our mobile teams coat infrastructure safely and efficiently, with no disruption and instant curing, even under electrified lines.

Meeting Critical Rail Safety Standards

GLS100R® is engineered to meet the UK’s most rigorous health, safety, and electrical standards. Certified for both fire and electrical risk mitigation, it’s approved by Network Rail and independently tested for performance in live rail environments.
Network Rail logo
Network Rail logo

We Are the Only Network Rail Approved Electrical Coating Supplier

Our patented GLS100R® coating is the UK’s only Network Rail-approved solution for infrastructure insulation. Independently tested by the University of Southampton and recognised with a Railway Industry Innovation Award, GLS100R® has saved millions by avoiding the need for costly bridge reconstructions and station closures.

Request Verified Test Data for GLS100R®

GLS100R® is our patented, independently tested electrical insulation coating, purpose-built for the UK rail industry. Verified by the University of Southampton, it insulates up to 193,000 volts and can be applied without disrupting operations. Request the data to see how GLS100R® is setting a new safety and performance standard for rail infrastructure.

Want to know if our rail coating is right for you?

Our GLS100R® Coating Process

A proven process designed for coating critical rail infrastructure with GLS100R®. From depots to bridges, our system ensures compliance, safety, and fast turnaround on live rail sites.

Book Site Survey

We’ll evaluate your rail infrastructure and identify the ideal coating solution for your location and risk level.

Get A Free Quote

Receive a full quote with coating scope, timelines, and certified compliance details for your rail asset.

Coating Applied

Our PTS-trained technicians apply the coating efficiently with no disruption to service or electrification systems.

Amey Rail

GLS were instrumental in the successful delivery of an urgent works package involving the application of their GLS100R coating system to the underside of a key bridge structure in South Wales. Faced with significant time constraints and unexpected challenges on site, GLS responded immediately. Their team was highly reactive and worked closely with the project lead to assess the conditions, identify key issues, and propose practical, effective solutions—all within a very tight timeframe. Their technical knowledge, hands-on support, and clear communication throughout were critical to the success of the works. The seamless application of the GLS100R coating not only resolved the issue but prevented a major project delay that would have cost hundreds of thousands of pounds. We were thoroughly impressed by GLS’s professionalism, adaptability, and commitment to helping us deliver under pressure. They played a key role in keeping the project on track.

Project Lead

Electricity Supply Board

I personally would like to thank GLS for their outstanding work in applying the GLS100R coating system to 27 transmission pylons across the North Island. This critical safety project was undertaken to reduce touch potential and eliminate the risk of electric shock to the public in accessible areas. GLS delivered the works on time and within budget, meeting all technical and safety requirements without compromise. Their team worked efficiently and professionally across multiple sites, with excellent coordination and attention to detail. I particularly like to commend Graham Jones, who led the project with exceptional clarity, commitment, and professionalism. His proactive management ensured seamless communication, safe execution, and high-quality results across the board. GLS have proven to be a trusted and capable partner, and we look forward to working with them on future infrastructure safety initiatives.

Project Manager

AmcoGiffen

This was an outstanding example of multi-disciplinary collaboration solving a critical problem with innovation and efficiency. GLS100R provided a simple, safe solution where traditional engineering failed to deliver.

Senior Engineer

REN Energy (Portugal)

GLS managed every aspect of this complex project professionally—from international logistics and site access to safe application and stakeholder coordination. Their team overcame every challenge with confidence and delivered outstanding results within an aggressive timeline. See you all again next year for phase 2.

Pedro Nevs Project Manager

Network Rail

GLS responded faster than any contractor we’ve ever worked with. Their work with GLS100R was not only compliant with ORR standards — it exceeded our expectations for quality and efficiency.

Network Rail Senior Asset Engineer Bob Willson

AMCO Giffen

GLS Coatings' professionalism and performance to the tasks in hand was exceptional. From the initial meeting and planning the work to the operatives onsite and the QA procedures undertaken during and after. I cannot fault GLS and would happily employ them again.

Gareth Griffiths, Project Manager 


F.G.Whitley and Sons Co.

I have been extremely impressed by the standard of workmanship of GLS staff and will definately be using your team again.

Paul Whitley, Director

GLS Case Studies

  • manchester victoria railway station where GLS insulated electrical components

    Rail Coating

    Bridge and Trackside Coating

    GLS applied GLS 100® to bridges and trackside assets to eliminate touch potential risks ahead of rail electrification, completing works on time despite challenging access.

  • cardiff intersection bridge where GLS applied rail coating

    Rail Coating

    Rail Bridge Underside Coating

    GLS coated the bridge underside to resolve clearance issues, avoiding a £40–50M rebuild and significantly reducing cost and disruption.

  • Rail Coating

    650V Electrical Cabinet Protection

    Emergency deployment of GLS100R across 650V sites to comply with ORR safety mandates. Full public risk mitigation and regulatory clearance achieved in under 14 days nationwide.

  • Electrical Coating

    High-Voltage Transmission Pylons

    GLS applied GLS100R to 35 pylons across rural Portugal, eliminating public touch potential risks without structural relocation. Completed in 5 weeks despite heat, access, and logistics challenges.

Rail Infrastructure Coating Across the UK

Frequently Asked Questions

  • Why is electrical insulation important on rail infrastructure?

    Electrical insulation prevents dangerous arcing, flashovers, and touch potential on steelwork near electrified systems. It protects workers, passengers, and assets while helping meet safety regulations.

  • What makes GLS100R® different from other coatings?

    GLS100R® is the only Network Rail-approved insulating coating, touch-dry in under 10 seconds and tested to withstand up to 193,000 volts. It’s also solvent-free, durable, and engineered specifically for live rail environments.

  • Can the coating be applied to live steelwork without disruption?

    Yes. GLS100R® can be safely applied with minimal disruption, even on live systems. Our mobile PTS-trained crews work efficiently during off-peak hours to avoid service impact.

  • Is the coating resistant to water, corrosion, and weathering?

    Yes. GLS100R® seals and protects against moisture, corrosion, UV, and harsh environmental exposure. It’s used on exposed structures like OLE bridges, footbridges, and platforms.Yes. GLS100R® is the only coating approved by Network Rail for electrical insulation applications, including use on location cases, steel structures, and other safety-critical infrastructure. It meets the stringent requirements of live rail environments.

  • Is the coating backed by a warranty or performance guarantee?

    Yes. GLS100R® applications come with a performance-backed guarantee, with lifespan projections up to 30 years depending on the substrate and use case.

  • Do you provide documentation or compliance reports after installation?

    Yes. Every project is fully documented using our digital iPad reporting system, including thickness checks, spark testing, and photographic records, all signed off by the client on completion.

Talk to our engineers about your rail project

GLS Coatings Ltd

Request a Case Study

Fill in your details and we’ll send it to your inbox.

Request a Brochure

Fill in your details and we’ll send it to your inbox.